Emblematic
Medellín, Antioquia
Metrocable design of phase 1, with 21 stations of line A and B, where the station Niquía and Poblado were the first to enter into operation in 1995; having a total network of 31.3 km of development.
Designed stations:
Built Area
105.000 m²
Status
Finalizado
Location
Gallery